Design documentation for checkpoint. The composition of the documentation. The role of design documentation in construction

The implementation of construction projects requires the development of special documentation, in accordance with which the work of specialists should be carried out. Its structure, as well as the procedure for approval, are determined by law - at the level of federal regulations. The main element of the corresponding set of sources is the project documentation. In some cases, it can be supplemented by working, as well as specifications. What are the features of the development project documentation in construction? What are the main sources of law governing its application?

What is project documentation?

Project documentation (or design estimates) is commonly understood as a set of sources, which may include both textual and graphic materials intended to determine the lists of architectural, technological, constructive, as well as engineering solutions used in the implementation construction project.

Depending on the complexity of the tasks facing the firm, the structure of the relevant documentation may vary. It depends on its composition, which specific specialists will be involved in the development of these sources.

The role of design documentation in construction

Actually, what is the design estimate documentation for? Its main role lies primarily in the regulation of the process of implementing a construction project. In addition, the preparation of relevant documentation is a legal requirement. Without it, it is impossible to accept the constructed property for operation. Similarly, design and estimate documentation is needed for the reconstruction or redevelopment of buildings and structures.

Thus, the sources under consideration are needed both in terms of legal requirements and for the implementation of the work itself as an objectively necessary source of data that allows you to build a building or structure that meets the established quality criteria, as well as within the costs determined by the project participants.

The project documentation system is a set of sources, in fact, reflecting the general understanding of the customer and the developer of the concept of the project, as well as establishing the procedure for the uninterrupted and prompt supply of various elements of the construction infrastructure. The important role of the sources under consideration predetermines the need to involve the most qualified specialists in their development, as well as following special algorithms.

So, the relevant work should be carried out only by those organizations that have to carry out work related to the preparation of the documentation in question. Let us consider in more detail who can carry out its development.

Who develops project documentation?

The developer himself or a competent person who is involved by him or the customer can create design and estimate documentation. Sometimes an individual under a contract. For example, it could be an experienced engineer.

The person who is responsible for the preparation of the documentation in question also coordinates the work necessary to create the relevant sources. In addition, he is responsible for the quality of documentation, as well as its compliance with technical regulations. The preparation of project documentation may in some cases be accompanied by the delegation of a number of developer functions to other persons who have the necessary competence.

The customer provides the developer with a number of relevant sources:

Urban planning plan for the site or a planning project for the territory that is supposed to be used as part of the construction project;

A document reflecting the results of engineering surveys or, if they are not ready, a task for their implementation;

Specifications, if the functioning of the construction object requires a technological connection.

Let's consider what requirements exist for the composition of sections of the relevant documentation, which is used in the framework of construction projects, in solving problems of reconstruction and overhaul of various buildings and structures.

Requirements for the structure of project documentation

The main source of law, which prescribes what requirements the project documentation of an object must meet, is the Town Planning Code of the Russian Federation. It also says that the requirements for the sources under consideration are established by the government of the Russian Federation. In practice, the composition of sections of project documentation intended for construction, reconstruction and overhaul is determined mainly in Decree of the Government of the Russian Federation No. 87, adopted on February 16, 2008. In addition, the criteria established by this source of law in many cases correlate with the provisions of the Town Planning Code.

They have a production purpose;

Characterized by non-production purpose;

Are linear.

Let us now consider how Decree No. 87 determines, in fact, the composition of project documentation. Compliance with these requirements is a key condition for the successful development of these sources.

The composition of the project documentation

In accordance with Decree No. 87, a correctly drawn up project documentation includes 12 sections. Their structure contains:

Explanatory note;

Section with layout plan land plot;

A document reflecting the list of architectural solutions;

Section on constructive, as well as space-planning building solutions;

A document reflecting information about the engineering infrastructure, supply networks, lists technical measures, content of various technological solutions;

Section explaining the essence of the construction organization project;

A document reflecting the essence of the project for the organization of those works that are associated with the demolition of objects capital construction, if this procedure required;

Section presenting a list of activities related to ensuring protection environment;

Section on activities aimed at providing access for people with disabilities;

A document reflecting the list of measures aimed at improving the energy efficiency of facilities;

Estimate reflecting data on objects;

Other documents, the inclusion of which in the design and estimate documentation is required by law.

It can be noted that the section that reflects information about the engineering infrastructure includes several subsections, namely, sources that disclose data on water supply, sanitation, heating, ventilation, air conditioning, gas supply, communications.

Also, in the structure of the section under consideration, there should be a subsection that provides information about technological solutions. It should be noted that in accordance with the Urban Planning Code, correctly drawn up project documentation includes sections presented in a slightly different structure. In particular, it involves the inclusion in the sources under consideration of a section reflecting information on ensuring the required level of safe operation building objects, which, in turn, is not provided for by Decree No. 87.

If the design documentation requires the inclusion of other sections that are not defined as its mandatory elements in the legislation, then their list is fixed in agreements between the developer of the relevant sources and the customer. It can be noted that some of those sections of the documentation that are defined by law must be included in it only if the construction project is implemented at the expense of budget organizations. Their specific list is given in Decree No. 87.

Can be compiled for individual stages of implementation construction works project documentation? Documentation, the project described in it, indeed, can be considered in the context of specific periods of implementation building plan. In this case, the need to develop a separate group of sources for each stage is fixed in the task for creating the project. At the same time, this procedure is subject to substantiation by special calculations, which confirm the possibility of the practical implementation of certain design solutions as part of the implementation of the construction project in stages.

In addition, the documentation used in specific periods of construction is developed to the extent prescribed. Its structure in terms of the main elements, as well as the presence of sections, must comply with the requirements established in Decree No. 87.

Purpose of working documentation

So, we have considered what a well-prepared project documentation includes, as well as its main features. However, in practice, this set of sources, in order to regulate construction work, as a rule, is also supplemented by another type of documentation - working documentation. It will be useful to study its features.

It can be noted that Regulation No. 87 does not unambiguously regulate the order in which the working component of the sources for the project implementation should be developed. The relevant legal act establishes that, like the project documentation, it includes both text and graphic documents. For example, drawings, various specifications.

In principle, design and working documentation can be created simultaneously. The composition and structure of the latter are generally determined by the customer or the developer, depending on the detailing of certain solutions given in the project documentation. The corresponding parameters can be fixed in the task sent to the developer of the considered sources.

The main elements of working documentation are drawings, specifications and other supplementary documents. Based on them, the implementation of those decisions that are provided for by the project is carried out.

Specifications as part of construction documentation

The next most important type of source that can complement project documentation is specifications. It will be useful to consider their specifics. To a certain extent, the application of technical specifications is also regulated by Decree No. 87. Thus, the relevant legal act states that they are developed and approved if:

The implementation of design documentation requires a larger list of requirements that reflect the reliability and safety of structures, relative to the list established by regulatory enactments;

The relevant requirements are not defined in the regulations.

Specifications must be developed in the manner prescribed by law. In practice, it is determined by the competent department - the Ministry of Construction and Housing of the Russian Federation in agreement with others. federal authorities RF.

Thus, the project documentation includes working documentation in statutory cases, as well as in the presence of certain agreements between the customer and the developer of the relevant sources. In some cases, it is supplemented by technical conditions, which are also created in the manner determined by the legislator.

The structure of project documentation according to Decree No. 87

In accordance with the provisions of Decree No. 87, the preparation of project documentation involves the inclusion of text and graphic elements in it. The first should reflect:

Information about the construction object;

Descriptions of various solutions, in particular technical ones;

Calculations that justify the decisions made in the development of the project.

The graphic part of the project documentation clearly displays the relevant solutions. For this can be used:

Blueprints;

Graphic schemes;

Other Required documents presented in graphical form.

The preparation of project documentation within the framework of completing both types of elements, both textual and graphic, must be carried out in compliance with the requirements of the legislation on state secrets by the organization that performs the relevant work. The way in which certain elements of the documentation in question should be drawn up is regulated by the standards established by the Ministry of Construction and Housing and Public Utilities of the Russian Federation.

Documentation review

So, we have considered that the design and estimate documentation includes, in accordance with what rules of law it is drawn up. It will also be useful to study one of the most important aspects of its application - the state examination of these sources.

The procedure under consideration is carried out in order to create construction objects in accordance with the requirements of the legislation in force in various fields, including those aimed at ensuring the observance of the rights of citizens and organizations in various legal relations. must undergo an examination in accordance with the Town Planning Code of the Russian Federation, as well as Federal Law No. 337, adopted on November 28, 2011. The corresponding procedure is carried out by the competent state authorities.

However, in preparation for construction firm can turn to the services of private structures that can provide support for the examination in question. What is the nature of this service?

Accompanying the state examination of construction documentation

Accompanying the examination of project documentation includes most often:

Conducting a non-state examination in accordance with criteria generally consistent with those that guide the competent departments;

Audit of specific sections of the documentation to identify shortcomings in them, determine the degree of compliance with established legal requirements;

Preparation of the necessary materials in order to transfer documents to government agency who conducts the examination.

Many firms also offer their customers advisory support directly during the period of their interaction with departments that conduct state examination of documentation. Experts recommend contacting companies that are ready to provide both legal, organizational and consulting support for the development of project documentation. In all the mentioned aspects, the assistance of experienced specialists can be useful for an enterprise implementing a construction project.

Placement of the order is carried out by a specialized organization
Mailing address
The actual address Russian Federation, 620014, Sverdlovsk region, Yekaterinburg, Malysheva st., 22
Telephone 7-343-3571590
Fax 7-343-3571195
Email [email protected]
The contact person Kostenko Irina Yakovlevna

Subject of contract

Subject of contract Development of design estimates for the manufacture of a transport checkpoint.
Initial (maximum) contract price RUB 349,980.00
Quantity of goods, scope of works or services Works on the development of design and estimate documentation for the manufacture of a transport checkpoint at the facility of the "Customer" conv. one
OKDP
Place of supply of goods, performance of work or provision of services Place of work performed: UBHR FKU "UOUMTS of the Ministry of Internal Affairs of Russia", Yekaterinburg, st. Elizavetinskoe highway, 48 A.
The term for the delivery of goods, performance of work or provision of services Terms (periods) of work performed: within 15 calendar days since the conclusion of the State contract.
Customer federal state institution "Ural District Department of Logistics of the Ministry of Internal Affairs of the Russian Federation"

Related documentation

  • . development of design and estimate documentation for the manufacture of a transport checkpoint estimate, development of design and estimate documentation for the manufacture of a transport checkpoint estimate.rar
  • . notice, notice.doc
  • . draft government contract, draft state contract.doc
  • . Kotir. request, Kotir. application.doc
  • More than 730 residents began to work in the capital's polyclinics

    More than 730 residents have started working in Moscow polyclinics. This was told by the Deputy Mayor of Moscow for social development Anastasia Rakova on Friday, April 3. Young professionals are recruiting medical institutions and also make home visits to patients.

  • In Moscow explained the rules of isolation

    Moscow Mayor Sergei Sobyanin said that they would not introduce passes for moving around the city yet, but it all depends on the development of the situation and how the residents of the capital will observe the self-isolation regime.

Similar lots

    Department of urban planning, communal and road management of the administration municipality"Krasnoyarsk region"

    State public institution "Department of highways of the Republic of Tyva"

  • “1.1. The municipal customer instructs, and the Contractor assumes the obligation to fulfill design work, namely: adjustment of the project documentation for the object "Modernization of boiler house No. 5 on the street. Communal 8-B / 1 in Ussuriysk", which passed the state examination ( registration number 25-1-5-0147-11 dated 10/19/2011), in accordance with the task (Appendix No. 1) within the time limits stipulated calendar plan works (Appendix No. 2) (hereinafter referred to as works). 1.2. The municipal customer accepts the result of the work and pays the price stipulated by the contract.”

    Administration of the Ussuriysk City District

  • Municipal Preschool educational institution "Kindergarten"Firefly" p. Rybushka, Saratov District, Saratov Region"

    Administration municipal district Pokhvistnevsky, Samara region

    Municipal state institution "Department of capital construction of the city district" Ohinsky "

To develop a project for new construction, reconstruction or overhaul, it is required to develop project documentation. The composition of project documentation is regulated by Decree No. 87 "On the composition of sections of project documentation and requirements for their content."

All projects can be divided into 2 categories: capital construction facilities and linear facilities.

Capital construction objects include various buildings and structures that have aboveground and (or) underground parts, including premises, engineering and technical support networks and engineering and technical support systems and intended for living and (or) activities of people, locating production, storage of products or keeping animals.

Capital construction projects do not include temporary structures. Temporary buildings do not require an examination at all, therefore, there are no requirements for the composition of project documentation.

Temporary buildings and the capital construction option have external similar features, while, according to the Town Planning Code of Russia, technical differences between the objects are defined:

  1. The object of the capital characteristics of the construction is tied to a permanent foundation, while there is always a link to the land. A temporary building may not have a foundation.
  2. A capital facility involves the collection of permits for full operation, while a temporary building has a minimum set of documents for permitting operation.
  3. The minimum service life for an object of category CS (capital construction) is 25 years, and may be more than 100 years. Temporary buildings should be used for no more than 25 years, with prerequisite demolition.
  4. The capital object cannot be demolished, transferred to another place, with the exception of a number of provisions of the urban planning code.
  5. The object of completed construction works involves the use of property rights with registration in the Rosreestr; for temporary buildings, restrictive permissive functions of property rights are presented.

Linear objects include: power lines, communication lines (including line-cable structures), pipelines, car roads, railway lines, bridges, viaducts, pedestrian crossings and other similar structures.

If a linear facility contains buildings and structures that are related to capital construction, then a project for a linear structure is developed according to the list of sections for linear structure and separately projects of buildings and structures in accordance with the requirements for sections on capital construction. Section 4 of the linear facility provides a list, characteristics and links to building designs that are part of the infrastructure of the linear facility.

The composition of the design documentation for the capital construction object:

Section 2 "Scheme of the planning organization of the land plot" (PZU)

Section 3 "Architectural Solutions" (AR)

Section 4 "Constructive and space-planning solutions" (KR)

Section 5 "Information on engineering equipment, on networks of engineering and technical support, a list of engineering and technical measures, the content of technological solutions"

This section consists of subsections:

a) subsection "Power supply system" (IOS1);

b) subsection "Water supply system" (IOS2);

c) subsection "Water disposal system" (IOS3);

d) subsection "Heating, ventilation and air conditioning, heat networks" (IOS4);

e) subsection "Communication networks" (IOS5);

f) subsection "Gas supply system" (IOS6);

g) subsection "Technological solutions" (IOS7).

Section 6 "Construction Organization Project" (POS)

Section 7 "Project for the organization of work on the demolition or dismantling of capital construction objects" (POD)

Section 8 "List of Measures for Environmental Protection" (LEP)

Section 9 "Measures to ensure fire safety" (PB)

Section 10 Accessibility Measures for Persons with Disabilities (ODA)

Section 10(1) "Measures to ensure compliance with energy efficiency requirements and requirements for equipping buildings, structures and structures with metering devices for energy resources used" (EE)

Section 11 "Estimates for the construction of capital construction facilities" (SM)

Section 12 "Other documentation in cases provided for federal laws»

The composition of design documentation for linear facilities:

Section 1 "Explanatory Note" (PZ)

Section 2 "Project of the right of way" (PPO)

Section 3 "Technological and Constructive decisions linear object. Artificial Structures (TKR)

Section 4 "Buildings, structures and structures included in the infrastructure of a linear facility" (ILO)

Section 5 "Construction Organization Project" (POS)

Section 6 "Project for the organization of work on the demolition (dismantling) of a linear facility" (POD)

Section 7 "Measures for the protection of the environment" (EP)

Section 8 "Measures to ensure fire safety" (PB)

Section 9 Construction Estimate (CM)

Section 10 "Other documentation in cases provided for by federal laws"

If any of the sections is not being developed, then this section is still written as part of the project, but we add the inscription “Not developed” to the note. The section numbering does not change.

For example, Section 7 “Design for the organization of work on the demolition or dismantling of capital construction objects” is not always required and we do not develop it, but the numbering of sections does not change because of this, the following section Section 8 “List of environmental protection measures” will remain section 8.

A section may contain subsections, such as in Section 5. In larger projects, subsections may also be subdivided. Parts are divided into books.

2345-IOS4.1.1 - Section 5. Information about engineering equipment, engineering networks, a list of engineering measures, the content of technological solutions. Subsection 4. Heating, ventilation and air conditioning, heating networks. Part 1. Heating, ventilation and air conditioning. Book 1. Major Decisions.

2345-IOS4.1.2 - Section 5. Information about engineering equipment, engineering networks, a list of engineering measures, the content of technological solutions. Subsection 4. Heating, ventilation and air conditioning, heating networks. Part 1. Heating, ventilation and air conditioning. Book 2. Automation systems for heating, ventilation and air conditioning

Each section, subsection, part and, if necessary, book, compiled in a volume, as well as each text and graphic document included in a volume, is assigned an independent designation, which is indicated on the cover, title page and/or in the main inscription, as well as in the headers and footers of text documents executed without main inscriptions.

The section "Other documentation in cases provided for by federal laws" contains sections that are not included in the main list, but are necessary in the project, for example:

  • Declaration industrial safety hazardous production facilities (PB HIF);
  • List of events for civil defense, measures to prevent emergency situations of natural and technogenic character(GOChS)
  • Technological regulations for waste management
  • Security and protection deratization system (OZDS)
  • Transport security
  • Survey reports

and other sections that are provided for by federal laws or the design assignment from the Customer.

All documents are assigned their own code, according to the system in force in the design organization. The cipher includes, for example, the number of the agreement (contract) and / or the code of the construction object (numeric, alphabetic or alphanumeric). It is allowed to include other codes used in CAD and EDMS in the basic designation.

If the section is divided into parts, then the part designation is made up of the section designation, to which the part number is added.

2345-PZ - Section 1. Explanatory note.

2345-PZU1 - Section 2. Scheme of the planning organization of the land plot. Part 1. General information.

2345-PZU2 - Section 2. Scheme of the planning organization of the land plot. Part 2. Solutions for inland rail transport. If the part is divided into books, then the designation of the book is made up of the designation of the part, to which the number of the book is added through a dot.

Requirements for the preparation of project documentation are set out in GOST R 21.1101-2013 SPDS. Basic requirements for design and working documentation

Volumes are completed in the following order:

— cover;

- title page;

- statement "Composition of design documentation" (It is allowed not to include the statement "Composition of design documentation" in each volume, but to complete it with a separate volume);

- text part;

— graphic part (drawings and diagrams).

The number of sheets included in the volume is determined from the need to ensure the convenience of work, as a rule, no more than 300 sheets of A4 format according to GOST 2.301 or an equivalent number of sheets of other formats.

The title page is performed in accordance with Form 12 (Appendix H GOST R 21.1101-2013).

The following details are on the cover:

- field 5 - the name of the capital construction object and, if necessary, the type of construction. The name of the construction object on the cover must correspond to the information given in columns 2 and 3 of the main inscription (see Appendix G);

- field 9 - volume number according to the list "Composition of design documentation" or "Composition of reporting documentation based on the results of engineering surveys" (if any);

- field 10 - year of issue of the document;

- field 11 - to place the table of registration of changes in the form 11 of Appendix M (if necessary).

The title page is performed according to form 13 (Appendix P GOST R 21.1101-2013).

The title page contains the following details:

- field 1 - abbreviated, and in its absence - the full name of the parent organization (if any); usually indicated for government organizations;

- field 2 - logo (optional), full name of the organization that prepared the document;

- field 3 - the number and date of issue of the certificate of admission to the relevant types of work (preparation of project documentation or surveys) that affect the safety of the capital construction object;

- field 4 - short name of the customer organization (if necessary). The name is indicated in the form: “Customer - name of the customer organization”;

- field 5 - the name of the capital construction object and, if necessary, the type of construction. The name of the construction object on the title page must correspond to the information given in columns 2 and 3 of the main inscription (see Appendix G);

- field 6 - type of documentation (if necessary);

- field 7 - the name of the document;

- field 8 - document designation;

- field 9 - volume number according to the list "Composition of design documentation" or "Composition of reporting documentation for engineering surveys" (if any);

- field 10 - positions of persons responsible for the development of the document;

- field 11 - signatures of the persons indicated in field 10, performed in accordance with GOST R 6.30. This field is also affixed with a certifying imprint of the seal of the organization that prepared the document;

- field 12 - initials and surnames of the persons indicated in field 10;

- field 13 - year of issue of the document;

- field 14 - for placing a table for registering changes in form 11 of Appendix M (if necessary);

- field 15 - for additional columns of the main inscription in accordance with Appendix G. It is allowed to present the information contained in these columns in a different form in accordance with the requirements established in the standards of the organization.

The title may also be in A3 format, if the document itself has such a format.